Cordial Deepam

Sasthamangalam

Cordial Deepam | Sasthamangalam

Aray of renewed happiness! There’s no place like home! Where else can you roam around without restraint and without breaking any laws?Home is an important place for many since it is the tangible representation of the people who live there. And through the years, “home” has come to symbolise something very particular to the majority of people. Celebrate the feeling of being home with Cordial Deepam at Sasthamangalam that encapsulates the inner peace you experience at your favourite place!

Amenities

  • Elegant A/C lobby
  • Home theatre
  • Children’s play area
  • Multipurpose hall
  • Air conditioned Gym
  • Provision for internet connectivity in each apartment
  • Intercom facility
  • Yoga & Meditation zone
  • Provision for cable TV connection in each apartment
  • Name boards
  • Infinity Swimming Pool
  • Generator backup for Lifts, water pumps, common areas, and designated points in each apartments
  • Sewage system
  • Security system
  • Water supply system through sump and over head tank
  • Automatic gate control system for entry/exit
  • Solar assisted lighting in common areas
  • CCTV cameras in main entrance, gate portion and lifts
  • Garbage disposal incinerator
  • Terrace party area
  • Air conditioned Guest Suite
  • Reticulated Gas system
  • Separate water meter for each apartment
  • Two designated common charging points for charging electrical cars
  • SKY WALK
  • Digital lock for main entrance door

Gallery

Monthly Work Progress Report

STATUS OF WORK AS ON DATE 05.11.2024

  • Piling works – Completed
  • Pile Cap works – Completed
  • Retaining wall works – Completed
  • Basement 2 to Terrace Floor Columns Concrete – Completed
  • Basement 1 to Terrace Floor Slab Concrete – Completed
  • Swimming pool & Overhead tank works – Completed
  • 2nd to Terrace Floor Ceiling Plastering works – Completed
  • 2nd to Terrace Floor Block works – Completed
  • Block making works – Completed
  • 2nd to 10th floor electrical wall chasing & box fixing works – Completed
  • 2nd (except 2B) to 10th floor Wire Pulling works – Completed
  • Terrace floor Amenity area piping & box fixing works – Completed
  • 2nd to 10th Floor Inside wall plastering works – Completed
  • Terrace Amenities area plastering works – Completed
  • 2nd Floor plumbing works – Completed
  • 3rd to 10th Floor plumbing works – Completed
  • Plumbing duct line works – 98% Completed
  • External wall plastering works – Completed
  • 2nd to 10th Floor water proofing works – Completed
  • 3 rd floor open terrace water proofing works – Completed
  • Basement Floor Retaining Wall Water Proofing works – Completed
  • 2nd to 10th Floor 1st & 2nd coat putty works – Completed
  • North side External Texture Putty works – 90% Completed
  • Front, Back & South side External Texture Putty works – Completed
  • North & Front side Water proof coat and Primer works – Completed
  • 2 nd to 10th floor Tile works – 95% completed
  • 3rd to 9th Floor False Ceiling works (Balcony & Waterline) works – 90% completed
  • Ground floor amenity area block works – Completed
  • Basement floor retaining wall works – Completed
  • Terrace area multipurpose hall block works – Completed
  • Sample Flat (4C) Tile works – Completed
  • Sample Flat Putty work, primer & 1 st coat painting – Completed
  • Sample Flat false ceiling works – Completed
  • Sample Flat Grill works – Completed
  • Sample Flat UPVC works – Completed
  • Sample Flat Handrail works – Completed (Except Glass Fixing)
  • Sample Flat Wooden Flooring works – Completed
  • Sample Flat CP & Sanitary Fixing works – Completed
  • Sample Flat Switch fixing & DB dressing works – Completed
  • Sample Flat Door Fixing works – Completed
  • HT tray works – Completed
  • Fire protection & detection works – 90% Completed
  • Basement 2 floor concrete works – Completed
  • HT & Fire room putty works – Completed
  • Basement 1 & 2 floor plastering works – Completed
  • Basement 1& 2 ceiling putty works – Completed
  • Lift works – 95% Completed
  • 2 nd to 10 th floor UPVC window works – Completed
  • Window grill making and fixing works – Completed
  • Stair handrail works – Completed
  • Internal first coat painting works – 65% Completed
  • Reticulated gas line works – 80% completed
  • Sump tank works – Completed
  • Ramp work – Earth levelling works in progress
  • Over Head Tank water proofing works – Completed
  • Internal switch fixing works – 85% Completed
  • Door fixing works – 80% Completed
  • HT 11KV Electric works – 60% Completed
  • Swimming pool works in progress
  • Lift cladding and passage tile works started
  • Common area and stair tiles works – 90% Completed
  • Septic Tank works in progress
  • 13 passenger lift ready for use
Transport & Medical
  • Railway station – 5.0km
  • KSRTC Bus Terminal – 5.0km
  • Kochuveli Railway Station – 10km
  • Airport – 7.0km
  • SK Hospital – 2.0km
  • Medical College 6.0km
  • Kims Hospital – 8.0km
  • SP Well Fort – 0.5km
  • Sree Ramakrishna Mission Hospital – 0.4km
  • Santhwana Hospital – 4.0km
  • SUT Pattom – 5.0km
Shopping & Dining
  • Style Plus – 3.0 km
  • Mall of Travancore – 9.0 km
  • Lulu Mall – 11.0 km
  • Ramachandran Super Market – 1.0 km
  • Centro Mall – 7.0 km
  • Ambrosia Restaurant – 4.0 km
  • SP Grand Days – 4.0 km
  • Mascot Hotel – 4.0 km
Education
  • Saraswathy Vidyalaya – 3.0 km
  • Christ Nagar School – 2.0 km
  • Arya Central School – 5.0 km
  • St Marys Pattom – 5.0 km
  • St Thomas School – 6.0 km
  • Kerala Law Academy – 3.0 km
  • University College – 3.0 km
  • MG College – 5.0 km
  • Mar Ivanios College – 6.0 km
Sport & Leisure
  • Golds Gym – 2.0 km
  • Jimmy George Stadium – 2.0 km
  • Sports Hub – 4.0 km
  • Trivandrum Club – 3.0 km
  • Sri Mulam Club – 3.0 km
  • Togore Theater – 3.0 km
  • Kowdiar Palace – 3.0 km
  • Museum & Zoo – 2.0 km
  • Kanakakkunnu Palace – 2.0 km
Worship
  • Sri Padmanabha Temple – 6.0 km
  • Thozhuvancode Temple – 2.0 km
  • Attukal Temple – 7.0 km
  • Vettukadu Church – 12.0 km
  • Metropolitan Cathredal Church, Palayam – 3.0 km
  • Palayam Juma Masjid – 3.0 km
  • Beemapally Mosque – 10 km

  • Foundation:RCC Pile Foundation as per design recommended by Structural consultant.
  •  Structures:RCC framed structure designed for higher seismic consideration.
GENERAL
  • Flooring:Superior quality Granite/ vitrified tile flooring in entrance lobby.
  • Staircase:Flooring with vitrified tiles and hand rails in GP/GI and balusters in MS pipes.
  • Electrical:All wiring with superior quality copper wires inside the apartments including PVC conduits of ISI standards. Power plugs with adequate light and fan points. Points controlled by ELCB and MCB with independent KSEB meter, Branded Modular switches of Legrand or equivalent quality. Provision for Washing Machine, Fridge etc. and provision for internet connection in one bed room.
  • Generator:Generator backup for elevators, water pumps, common area light points and 800W light load in each apartment.
  • Fire Safety:Fire Protection systems as per rules.
  • Painting:Premium quality putty finish with plastic emulsion paint for internal walls and for ceiling. Outside walls painting with superior quality weather shield paint.
  • Water supply:Water supply arrangements through sump and overhead tank. Individual water meter for each Apartment.
  • Balcony:Flooring with anti-skid ceramic/vitrified tiles and SS handrails with glass.
  • Elevators:One fully automated passenger lift and one fully automated bed lift. Johnson / Kone/Equivalent
LIVING/DINING
  • Main Door:Pre Hung Door with Engineered wood jamb full width with both side Architraves. Door of 35mm thick panel, 55 ball bearing hinges, 55 eye viewer, tower bolt, magnetic door stopper with Biometric/card lock system. Ferro/JACSON/Equivalent.
  • Flooring:Double charged Vitrified tiles/Glazed vitrified tiles 800 x 800 or 1200 x 600. Somany/AGL/RAK/TOSCANA/KERAMICA/Equivalent.
  • Painting:Internal walls & Ceiling: 2 coats wall putty + 1 coat primer + 2 coats smooth silk/matt Emulsion paint. Asian/Jotun/Equivalent.
  • Electrical:DB/Switches/Power outlets/Telephone socket/Provision for Cable TV/ WiFi/Intercom.
  • Windows:Windows Aluminium/UPVC sliding windows with mosquito net provision as per Architectural drawings.
  • Air-Conditioning:Wired provision as per request.
  • Dining Wash Basin:Wash basin & Pillar tap. Roca/Jaquar/Kerovit/Queo/Equivalent
  • Fire Safety:As per appproved drawing from Fire & Rescue Department
MASTER BED ROOM
  • Door:Pre Hung Door with Engineered wood jamb 100mm width with one side Architrave. Door of 35mm thick panel, SS ball bearing hinges, tower bolt, magnetic door stopper etc. S5 Mortise Lock with Lever Handles with one side Key and other side latch. Ferro/JACSON/Equivalent.
  • Flooring:Double charged Vitrified tiles/Glazed vitrified tiles 800 x 800 or 1200 x 600, Somany/AGL/RAK/TOSCANA/KERAMICA/Equivalent.
  • Painting:Internal walls & Ceiling: 2 coats wall putty+1 coat primer + 2 coats smooth silk/matt Emulsion paint. Asian/Jotun/Equivalent
  •  Electrical:Switches/Power outlets/Telephone socket/Provision for Cable TV/WiFi.
  • Windows:Aluminium/UPVC sliding windows with mosquito net provision as per Architectural drawings.
  • Air-Conditioning :Wired provision.
BED ROOMS
  • Door:Pre Hung Door with Engineered wood, jamb 100mm width with front side Architrave and other side tacker. Door of 35mm thick panel with mortise lock Lever Handles with one side Keys and other side latch, SS hinges, SS finish tower bolt 6″ INo. Magnetic door stopper SS finish. Ferro/JACSON/Equivalent.
  • Flooring:Double charged Vitrified tiles/Glazed vitrified tiles 800 x 800 or 1200 x 600. Somany/AGL/RAK/TOSCANA/KERAMICA/Equivalent
  • Painting:Internal walls & Ceiling: 2 coats wall putty + 1 coat primer + 2 coats smooth silk/matt Emulsion paint. Asian/Jotun/Equivalent
  • Electrical:Switches/Power outlets
  • Windows:Aluminium/UPVC sliding windows with mosquito net provision as per Architectural drawings.
  • Air-Conditioning:Wired provision as per request
  • Fire Safety:As per approved drawing from Fire & Rescue Department
BATHROOMS
  • Wall & Floor:Wall 600 x 300 & Floor, 300 x 300 Vitrified/GVT/Ceramic Tiles with 3mm spacer & Epoxy Grouting for Floor. Somany/AGL/RAK/Equivalent. Ceiling 600 x 600 false ceiling Tiles
  • Plumbing & Sanitary:Wall mounted WC with concealed flush tank/flush valve with Diverter and shower Head, wash basin with CP Pillar cock, Provision for horizontal/vertical type Water Heater for Master Bathroom and for other bathrooms as per request.
LocationSasthamangalam
Configurations2/3 BHK
StatusNew launch
RERA Registration NumberK-RERA/PRJ/TVM/050/2023

Enquire Now!

    Related Projects

    Established in 1982, Cordial Homes is a leading builder and developer in South India. With over 42 years of experience and 133 completed projects in Chennai and Kerala, we’ve earned the trust of 2600+ customers. 

    Quick Links

    Contact us

    Accreditations

    © Copyright 2024 Cordial Homes . All rights reserved | Managed by Easynetdigital|Privacy Policy