Cordial Paradise

Poojappura

Cordial Paradise | Poojappura

The luxury apartment project is situated at Poojappura, which is one among city’s prime localities. The apartment has all modern amenities to provide the most luxurious lifestyle in a serene atmosphere. Closeness and easy accessibility to major educational institutions, collectorate, Shopping centres, Hospitals and other essential services makes the project even more attractive and is also well connected by road, rail and air routes.Cordial Paradise comprises basement 3, basement 2, basement 1, ground, 19 floors and hence ensures a modern lifestyle.

Amenities

  • AI-Enabled Home
  • Video Door Phone
  • Elegant A/C lobby
  • Children’s outdoor play area
  • Indoor games room
  • Terrace Party Area
  • Provision for electric car charging for all parking slots
  • Drivers room
  • Servants room
  • Terrace mini turf
  • Multipurpose hall
  • Air Conditioned Gym
  • Provision for Internet connectivity in each apartments
  • Intercom facility
  • Provision for cable TV connection in each apartments
  • Name boards
  • Generator back-up for lifts, water pumps, common areas and designated points in each apartments
  • Sewage system
  • Security system
  • Water supply system through sump and over- head tank
  • Automatic gate control system for entry/ exit
  • Solar assisted lighting in common areas.
  • CCTV camera in main entrance, gate portion and lifts
  • Garbage disposal- incinerator
  • Barbeque counter
  • Air Conditioned Guest suite.
  • Separate water meter for each apartments
  • Digital lock for main entrance door.
  • Medical care at door step.
  • Yoga, meditation Centre.

Gallery

Monthly Work Progress Report

STATUS OF WORK AS ON DATE 10.07.2024

    • Foundation works – Completed
    • Basement – 3 column concrete works – Completed
    • Basement – 2 floor slab concreting works – Completed
    • Basement – 2 column concrete works – Completed
    • Basement – 1 floor slab concreting works – Completed
    • Basement – 2 to Basement – 1 ramp concreting works – Completed
    • Retaining wall works – Completed
    • Ground floor slab concreting works – Completed
    • Swimming Pool concreting works – Completed
    • First to Terrace floor slab concrete works – Completed
    • First to Terrace floor column concrete works – Completed
    • Machine room base slab concrete works – Completed
    • Open terrace passage cover slab – Completed
    • Water tank base slab & side wall – Completed
    • Machine room & water tank shuttering work in progress.
    • 1st to 16th floor ceiling plastering works – Completed
    • 17th to 19th floor ceiling plastering works – 60% completed
    • 1st to 16th floor block masonry works – Completed
    • 17th floor block masonry works – 80% completed
    • 18th & 19th floor block masonry works – 60% completed
    • 1st to 14th floor wall plastering works – Completed
    • 15th to 17th floor wall plastering works – 60% completed
    • Basement 1 & 2 floor column & wall plastering works – 30% completed
    • 1st to 15th floor electrical work wall chasing & metal box fixing work – Completed
    • 16th & 19th floor electrical work wall chasing & metal box fixing work – 60% completed
    • 2nd to 10th floor plumbing work, wall chasing & core cutting works – Completed
    • 11th & 12th floor plumbing work, wall chasing & core cutting works in progress
    • 2nd to 9th floor toilet & balcony water proofing works – Completed
    • 2nd to 13th floor ceiling & wall 1st coat putty works – Completed
    • 2nd to 7th floor ‘C’ flat wall 2nd coat putty works – Completed
    • 2nd to 6th floor ceiling 2nd coat putty works – Completed
    • First floor ceiling & wall 1st coat putty works – 80% Completed
    • 2nd to 10th floor firefighting works – Completed
    • 11th floor firefighting works under progress
    • Front side External wall plastering works – 80% completed
    • East side External wall plastering works – 50% completed
    • 2nd to 9th floor wire pulling works – Completed
    • 2nd to 7th floor false ceiling, fire and water line covering Box works – Completed excluding toilet and passage
    • 2nd to 11th floor balcony handrail fixing works – Completed
    • 12th to 18th floor balcony handrail fixing works – 70% Completed
    • Tile work is under progress
    • Block making works in progress
    • Sample Flat (2C) tile work – Completed
    • Sample Flat false ceiling work – Completed
    • Sample Flat painting work – Completed
    • Sample Flat Grill work – Completed
    • Sample Flat UPVC work – Completed
    • Sample Flat handrail fixing work – Completed
    • Sample Flat CP & Sanitary fixing work – Completed
    • Sample Flat Switch fixing & DB dressing work – Completed
Transport & Medical
  • Railway Station – 4.8km
  • KSRTC Terminal – 4.8km
  • Trivandrum International Airport – 9.6 km
  • PRS Hospital – 4.0km
  • TVM Medical College – 9.0km
  • KIMS hospital – 10.9km
  • SP Fort Hospital – 5.0km
  • SK hospital – 2.2km
WORK & EDUCATION
  • Christ Nagar School – 8.0km
  • St. Thomas School – 11.0km
  • St. Mary’s Central School CBSE – 800m
  • Saraswathi vidyalaya – 5.0km
  • University College – 5.0km
  • Govt. Ayurveda College – 1.7km
  • RGCB – 2.0 km
  • University Institute of Management – 200 m
  • SAT Bio Medical Technology Wing – 500 m
  • LBS Technology for Women – 1.5 km
  • NSS College for women – 4.0 km
  • SCT College of Engineering – 3.2 km
SHOPPING AND DINING
  • Style plus – 4.3km
  • Mall of Travancore – 9.0km
  • Lulu Mall – 13.0km
  • Hycinth Hotel – 4.1km
  • Taj Vivanta – 4.5km
  • Mascot hotel – 5.4km
  • Attukal Shopping Complex – 5.3km
Sport & Leisure
  • Gold’s Gym – 5.1km
  • JG Indoor Stadium – 4.7km
  • Sports Hub – 5.0km
  • Trivandrum Club – 4.2km
  • Sree Moolam Club – 3.8km
  • Kowdiar Palace – 6.4km
  • Museum & Zoo – 5.2km
  • Kanakakunnu palace – 5.0km
Worship
  • Sree Padmanabhaswamy Temple – 6.2km
  • St. Joseph’s Metropolitan Cathedral, Palayam – 4.7km
  • Palayam Juma Masjid – 4.7km
  • Attukal Bhagvathy Temple – 5.0km
  • Poojappura Saraswathi Mandapam – 1.0km
Banking
  • State Bank Of India (SBI) Headquarter – 1.5km
  • Canara Bank – 1.8km
  • Union Bank – 1.1km
  • HDFC – 900m
  • Foundation: RCC Pile Foundation as per design recommended by Structural consultant.
  • Structures: RCC framed structure designed for higher seismic consideration.
GENERAL
  • Flooring: Superior quality Granite/vitrified tile flooring in entrance lobby.
  • Staircase: Flooring with vitrified tiles and hand rails in GP/GI and balusters in MS pipes.
  • Electrical: All wiring with superior quality copper wires inside the apartments including PVC conduits of ISI standards. Power plug with adequate light and fan points. Points controlled by ELCB and MCB with independent KSEB meter, Branded Modular switches of Legrand or equivalent quality. Provision for Washing Machine, Fridge etc. and provision for internet connection in one bed room.
  • Generator: Generator backup for elevators, water pumps, common area light points and 800W light load in each apartment.
  • Fire Safety: Fire Protection systems as per rules.
  • Painting: Premium quality putty finish with plastic emulsion paint for internal walls and for ceiling. Balcony handrails painting with enamel paint. Outside walls painting with superior quality weather shield paint.
  • Water supply: Water supply arrangements through sump and overhead tank. Individual water meter for each Apartment.
  • Balcony: Flooring with anti-skid ceramic/vitrified tiles and GI/GP handrails
  • Elevators: Two fully automated passenger lift and one fully automated bed lift. Johnson/Kone/Equivalent.
LIUING/DINING
  • Main Door: Pre Hung Door with Engineered wood jamb full width-with both side Architraves. Door of 35mm thick panel, SS ball bearing hinges, SS eye viewer, tower bolt, magnetic door stopper with Biometric/card lock system. Ferro/JACSON/Equivalent.
  • Flooring: Double charged Vitrified tiles/Glazed vitrified tiles-800 x 800 or 1200 x 600. Somany/AGL/RAK/TOSCANA/KERAMICA/Equivalent.
  •  Painting: Internal walls & Ceiling: 2 coats wall putty + 1 coat primer + 2 coats smooth silk/matt Emulsion paint. Asian/Jotun /Equivalent.
  • Electrical: DB/Switches/Power outlets/Telephone socket/Provision for CableTV/WiFi/Intercom.
  • Windows: Aluminium/UPVC sliding windows with mosquito net provision as per Architectural drawings.
  • Air-Conditioning: Wired provision as per request.
  • Dining Wash Basin: Wash basin & Pillar tap. Roca/Jaquar/Kerovit/Queo/Equivalent
  • Fire Safety: As per approved drawing from Fire & Rescue Department with smoke detectors and sprinklers.
MASTER BED ROOM
  • Door: Pre Hung Door with Engineered wood jamb 100mm width-with one side Architrave. Door of 35mm thick panel, SSball bearing hinges, tower bolt, magnetic door stopper etc. SS Mortise Lock with Lever Handles with one side Key and other side latch. Ferro/JACSON/Equivalent.
  • Flooring: Double charged Vitrified tiles/Glazed vitrified tiles-800 x 800 or 1200×600. Somany/AGL/RAK/TOSCANA/KERAMICA/Equivalent.
  • Painting: Internal walls & Ceiling: 2 coats wall putty + 1 coat primer + 2 coats smooth silk/matt Emulsion paint. Asian/Jotun/Equivalent. Electrical: Switches/Power outlets/Telephone socket/Provision for Cable TV/WiFi.
  • Windows: Aluminium/UPVC sliding windows with mosquito net provision as per Architectural drawings.
  • Air-Conditioning: Wired provision.
  • Fire Safety: As per approved drawing from Fire & Rescue Department with smoke detectors and sprinklers.
BED ROOMS
  • Door: Pre Hung Door with Engineered wood, jamb 100mm width-with front side Architrave and other side tacker. Door of 35mm thick panel with mortise lock Lever Handles with one side Keys and other side latch, SS hinges, SS finish tower bolt 6"-1No. Magnetic door stopper SS finish. Ferro/JACSON/Equivalent.
  • Flooring: Double charged Vitrified tiles/Glazed vitrified tiles-800×800 or 1200 x 600. Somany/AGL/RAK/TOSCANA/KERAMICA/Equivalent.
  • Painting: Internal walls & Ceiling: 2 coats wall putty + 1 coat primer + 2 coats smooth silk/matt Emulsion paint.Asian/Jotun/Equivalent.
  • Electrical: Switches/Power outlets.
  • Windows: Aluminium/UPVC sliding windows with mosquito net provision as per Architectural drawings.
  • Air-Conditioning: Wired provision as per request.
  • Fire Safety: As per approved drawing from Fire & Rescue Department with smoke detectors and sprinklers
BATHROOMS
  • Wall & Floor: Wall 600 x 300 & Floor, 300 x 300 Vitrified/GVT/Ceramic Tiles with 3mm spacer & Epoxy Grouting for Floor. Somany/AGL/RAK/Equivalent.
  • Ceiling: 600 x 600 false ceiling Tiles
  • Plumbing & Sanitary: Wall mounted WC with concealed flush tank/flush valve with Diverter and shower Head, wash basin with CP Pillarcock, Provision for horizontal/vertical type Water Heater for Master Bathroom and for other bathrooms as per request.
  • Doors: Pre Hung Door with matching PVC wrapped WPC jamb, with front side Architrave and other side tacker. Door of 30mm thick panel with 4 side edgespainted jamb width 100 mm. Latch with Lever Handles without Keys, SS finish hinges, SS finish tower bolt. Ferro/JACSON/
  • Ventilator: Aluminium/UPVC with exhaust fan provision.
KITCHEN
  • Doors: Pre Hung Door with Engineered wood, jamb with front side Architrave and other side tacker. Door of 35mm thick panel with glass opening, jamb width 100mm, mortise lock Lever Handles with one side Keys and other side latch, SS hinges, SS finish tower bolt 6"-1No. Magnetic door stopper SS finish. Ferro/JACSON/Equivalent.
  • Flooring: Double charged Vitrified tiles/Glazed vitrified tiles-800 x 800. Somany/AGL/RAK/KERAMICA/Equivalent.
  • Painting: Internal walls & Ceiling: 2 coats wall putty+1 coat primer +2 coats smooth silk/matt Emulsion paint. Asian/Jotun/Equivalent.
  • Working Platform: 60cm working platform with polished granite/vitrified finish top,stainless steel sink with drain board and kitchen faucet.ROCA/JAQUAR/Kerovit/Queo/Equivalent
  • Electrical: Switches/Power outlets/Sockets 6A/16A. Provision for fridge and water purifier.
  • Windows: Aluminium/UPVC sliding windows with mosquito net provision as per Architectural drawings.
  • Fire Safety: As per approved drawing from Fire & Rescue Department with smoke detectors and sprinklers.
Location Poojappura
Configurations 2/3/4 BHK
Status New launch
RERA Registration Number K-RERA/PRJ/TVM/099/2022

Enquire Now!

    Related Projects

    Established in 1982, Cordial Homes is a leading builder and developer in South India. With over 42 years of experience and 133 completed projects in Chennai and Kerala, we’ve earned the trust of 2600+ customers. 

    Quick Links

    Contact us

    Accreditations

    © Copyright 2024 Cordial Homes. All rights reserved | Privacy Policy